top of page
About This Project
Scope of Work:
- Construction of Berlin-type retaining wall for excavation support
- Installation of foundation piles
- Dewatering operations for groundwater control
- Execution of pile load test to verify bearing capacity
Purpose: To ensure safe excavation, stable foundation conditions, and verified pile performance
Collaboration: Project executed in cooperation with I. Demourtsidis Construction Ltd
Focus: Comprehensive geotechnical support combining excavation retention, dewatering, and deep foundation verification
Portgate


bottom of page
