About This Project
Scope of Work:
- Stabilization of the existing tunnel structure using soil nails and shotcrete for reinforcement
- Performed pullout test to ensure nail anchorage performance
Purpose: To reinforce and stabilize the tunnel structure ensuring long-term safety and durability
Collaboration: Project carried out in cooperation with CSP
Focus: Precision soil nailing and structural shotcrete application with validated performance through testing
Happy Valley Tunnel