top of page
About This Project
Scope of Work:
- Installation of pile foundation system for structural support
- Construction of pile wall for excavation retention
- Execution of one-face cut-off wall to control groundwater ingress
Purpose:
To ensure a stable foundation system while effectively managing groundwater conditions during constructionCollaboration:
Successfully delivered in partnership with Leptos GroupFocus:
High-standard foundation and retaining works with strong emphasis on structural integrity, groundwater control, and construction reliability
Blue Marine Limassol


bottom of page