About This Project
Scope of Work:
Construction of deep foundation piles for road bridges, including piles for bridge piers and abutments
Installation of foundation piles for under pass road
Execution of pile load tests to verify load-bearing capacity and performance
Conducting pile integrity tests to ensure structural continuity and quality of each pile
Purpose: To reinforce and stabilize the structure ensuring long-term safety and durability
Collaboration: Project carried out in cooperation with Iacovou Bros Construction, ensuring coordinated execution across all bridge and road foundation works.
Focus: High-precision pile installation, quality-controlled drilling and concreting operations, and validated performance through certified load testing and integrity testing.
Nicosia Ring Road Phase B3






